Good Repair Guide: External timber steps
Product Description
External timber steps and handrails are exposed to all weather conditions, including regular wetting and drying and high levels of UV light. Regular wetting and drying causes swelling and shrinkage of the timber, while changes in ambient temperature results in continual thermal expansion and contraction. The constant movement of the timber causes warping and cupping, joints to open up, nails to pop and fixings to become loose. In addition, timber that remains wet for extended periods of time becomes slippery, and rotting may occur.
This Good Repair Guide identifies some of the common problems and repair options for external timber steps and handrails. When damage to external steps is extensive, the best option is often full replacement.
Disclaimer: Please note that our publications reflect the regulations and best practices on the date of release, which is shown on the publication. As regulations and industry standards evolve, we always recommend that our publications be read in conjunction with the latest building code clauses and standards.
| Publication date | 1 April 2015 |
|---|---|
| Author | Alide Elkink |
| Product type | Book |
| Availability | Available |
| Product code | BK121 |
Products you recently viewed
REBRI Resource Recovery Plasterboard: Onsite sorting, storage and processing (PDF)
This guide provides good practice advice to maximise recovery rates for plasterboard waste from construction and demolition (C&D) sites. The guidelines cover the sorting of plasterboard, processing of plasterboard into crushed gypsum and paper and the storage of the raw and processed product on construction or demolition sites.
The aim is to assist the operators of mobile crushing plants to adopt practices that:
- maximise the amount of plasterboard sorted from the landfill or cleanfill
- minimise contamination or damage of the processed product
- avoid or minimise environmental and nuisance effects from processing
This guideline covers:
- finding good markets for crushed plasterboard
- on-site versus centralised processing
- setting up a mobile plant on site
- operating a mobile crushing plant
- testing and storage of crushed plasterboard
Disclaimer: Please note that our publications reflect the regulations and best practices on the date of release, which is shown on the publication. As regulations and industry standards evolve, we always recommend that our publications be read in conjunction with the latest building code clauses and standards.
- environmental, health and safety hurdles
- resources and contacts
- other guidelines in this series
Stairs Module: Stair Barriers
This module covers design and construction requirements for barriers, specifically in relation to stairways.