
Guideline October 2013 (October 2013)
Product Description
In this issue: Build 138 correction, E2/AS1 hip ridge flashing requirements, Building Act Schedule 1, Compatibility - air seals and bitumen-based flashing tape, Using Tables 4.1 and 4.3 in NZS 3604:2011 Timber-framed buildings, ALF 3.2 custom R-values, Appointment of a new BRANZ CEO Chelydra Percy, Ministry of Consumer Affairs Han Hu paint recall, Tapware, Cameras - a battery story, BRANZ seminars - Passive Design