Skip to main content

Waikoukou (October 2020)

Product Description

The refurbishment of 22 Boulcott Street, Wellington, was completed in 2017. During the refurbishment, much of the original building’s structure and foundations were retained. New reinforced concrete shear walls, structural steel framing and a curtain wall façade system were added. Originally two separate structures, the refurbishment saw the connection of two buildings and the addition of a further 3 storeys.

Product Information

Publication date October 2020