Skip to main content

Non-structural elements #4: Seismic clearance at penetrations (August 2015)

Product Description

NZS 4219:2009 requires 50 mm clearance at penetrations through a structure, such as walls and floors. This clearance is intended to avoid interactions between the service and the structure due to differential seismic movement.

Product Information

Publication date August 2015