Image of Thermal bridging in external walls: Stage two

ER64 Thermal bridging in external walls: Stage two

Free
Product code ER64
Publication date

The research explores the drivers for the rates of framing identified during design, detailing and frame and truss manufacturing; the impacts of the current percentages of framing alongside uninsulated weak points and thermal bridging issues and the effect these have on wall R-value; and advanced framing and insulation solutions to address the range of issues identified.