Appraisal number: 641 (2021)
Date issued: 24 May 2021
NuLine Plus™ Weatherboard Cavity System
Description
The NuLine Plus™ Weatherboard Cavity System is an external wall cladding system for residential and light commercial type buildings where domestic construction techniques are used.
The system consists of horizontally fixed NuLine Plus™ fibre cement weatherboards installed over non-structural or structural timber battens to form the cavity, flashings and accessories and is finished with a latex paint system.
The system incorporates a primary and secondary means of weather resistance (first and second line of defence) against water penetration by separating the cladding from the external wall frame with a nominal 20 mm drained cavity.
Technical literature
NULINE+PLUS Weatherboard, March 2019.
Architectural Drawings:
- NU01 Foundation Detail Cavity Construction February 2016
- NU02 Plank Joint Cavity Construction February 2016
- NU03 Soffit Detail Cavity Construction February 2016
- NU04 Exposed Nail Fix Cavity Construction February 2016
- NU05 External Boxed Corner Cavity Construction February 2016
- NU06 External Soaker Corner Cavity Construction February 2016
- NU07 Window Head Cavity Construction February 2016
- NU08 Window Sill Cavity Construction February 2016
- NU09 Window Jamb Cavity Construction February 2016
- NU10 External Corner Detail with BGC Profile Cavity Construction February 2016
- NU11 Internal Corner Detail Cavity Construction February 2016
- NU12 Internal Corner Detail with BGC Profile Cavity Construction February 2016
- NU13 Meter Box Head Cavity Construction February 2016
- NU14 Meter Box Sill Cavity Construction February 2016
- NU15 Meter Box Jamb Cavity Construction February 2016
- NU16 Enclosed Deck Detail Cavity Construction February 2016
- NU17 Interstorey Drainage Joint Detail Cavity Construction February 2016
- NU18 Enclosed Balustrade/Parapet Wall Cavity Construction February 2016
- NU19 Enclosed Balustrade Wall Plan Detail Cavity Construction February 2016
- NU20 Balustrade to Wall Junction Detail Cavity Construction February 2016
- NU21 Gutter to Wall Junction Detail Cavity Construction February 2016
- NU22 Transverse Apron Flashing Detail Cavity Construction February 2016
- NU23 Parallel Apron Flashing Detail Cavity Construction February 2016
- NU24 Eaves with No Soffit Detail Cavity Construction February 2016
- NU25 Pipe Penetration Detail Cavity Construction February 2016
- NU26 Window Head/Jamb Junction Detail Cavity Construction February 2016
- NU27 Window Sill/Jamb Junction Detail Cavity Construction February 2016
Consenting instructions
Always refer to the Appraisal in full and the technical literature.