BRANZ. Welcome to BRANZ

Login

My BRANZ.

 Research Reports

Each year BRANZ invests the Building Research Levy in research as part of our vision to inspire the industry to provide better buildings for New Zealanders. 

Outputs and results from this research is transformed into a technical research report which may be used by the industry as an information resource.

The reports below reflect research done by BRANZ and external independent providers which are funded by the levy. 

Search by keyword or view the research report list

 Research Reports

  • Page 12 of 23 (of 459)
 
 
 
 
 
 
Results
ItemPriceAdd
Investigation into the performance of brick veneer walls installed with Urea Formaldehyde Foam Insulation - A case study, SR234

Investigation into the performance of Urea Formaldehyde Foam Insulation, SR233

Investigation of the strength and stiffness of dry-bedded masonry ties in various veneer types, SR152

Investigative pull-out testing of anchors near corners of concrete house foundations formed with masonry header blocks, SR357

Kotuku Apartments thermal modelling design stage, SR362

Land value capture to fund transport investments in cities, ER17

Leakage of smoke control door assemblies, SR151

Learnings from the BRANZ Refurbishments, SR323

Leveraging expertise to deliver medium-density housing, SR392

Life cycle costs and analysis of roof cladding systems, SR248

Life cycle costs of claddings, SR075

Life cycle costs of selected claddings for non-residential buildings, SR097

Lifetime housing - the value case, SR263

Maintaining tenability of exitways in buildings in the event of fire - literature review, SR148

Maintenance and common repair issues in medium-density housing, SR386

Managing subfloor moisture, corrosion and insulation performance, SR354

Materials within geothermal environments, SR393

Maximum wall bracing rating that is compatible with NZS 3604 Construction - phase I - theory, summary and bracing testing, SR162

Maximum wall bracing rating that is compatible with NZS 3604 Construction - phase II - testing of room 1, SR163

Maximum wall bracing rating that is compatible with NZS 3604 Construction - phase III - testing of room 2, SR164